在线播放三级-在线播放日本-在线播放免费播放av片-在线播放毛片-在线播放精品视频-在线播放精品

熱線電話
百葉窗圖片載入中
?
聯系我們

Guangdong Lituo automation equipment Co., Ltd

Contact: Mr. Zhang

Sales Hotline: 18665717216

Telephone: 020-84551179

Fax: 020-31076026

QQ:731306804

Mailbox: zhangging@litou668.com

URL: www.phlur.com.cn

Address: Almond altar town, shunde district, foshan city, GaoZan Village Gao Gui Lucy 2 no. 1 # 3

How to adjust the operation of the coating machine?

How to adjust the operation of the coating machine?

In this age of mechanization, any work is done using machines, but for the wrapping machine, if there is a quality problem in use. Well, do you know how to debug? Your first response is to shut down the machine and debug it. But the mechanical involved too many products. If stopped, the entire production could be scrapped. And in the face of such a thing, do you know how to debug the coating machine?

Debugging of woodworking cladding machine:

1, the location for the profile: take a good production profile, requirements: not bent or distorted, on the bed on a conveying wheel, according to the profile width, shape and coating requirements, adjustment between the two rows of the conveying wheel distance; adjustment by foot and platform width and height, which is suitable for coating profile requirements installed on both sides of the guide wheel; the conveying wheel is parallel to the direction of movement and profile.

2 、 press wheel installation and adjustment: according to the profile of the profile to install and adjust the small pressure roller, generally choose profiles central line or section, the outline of the main curve of points or low, along the contour line by point transition, rolling. Compound the profile with the diaphragm. Installation of small pressure wheel to make the line force balance, about the same time. There is a press wheel, the bottom must be installed support wheel, make the line up, down, left and right force balance. Otherwise, the line will appear at the junction of false and so on. The large plane can be crushed by the small pressure wheel from the center to the two sides, and the small pressure wheel 3 will gradually rotate at the 90 degree corner. The shape of the complex lines, small pressure wheel should be arranged naturally, can not be forced to shape. In particular, decorative paper should be more natural and smooth.

Application of coating machine 3, rubber box or roll coating system

The cold box operation method:

Unloading of rubber box: the rubber box is lifted up smoothly and the rubber box is naturally separated from the platform.

Adjust the thickness of the adhesive layer: adjust the thickness of the adhesive layer by turning the lifting bolts at the lower sides of the rubber box.

The roller coating device use:

Can adjust the coating layer thickness on the rotating shaft frictioning plastic box. Turn the adjusting handle, turn clockwise, thicken the rubber band, turn counterclockwise, and make the adhesive layer thin. Until the coating is even.

主站蜘蛛池模板: 男人天堂网址| 欧美精选欧美极品| 香蕉久久高清国产精品免费| 好大好硬好深好爽gif图| 韩日理论片| 奇米白色| 青草青草久热精品视频在线网站| αv在线视频| 欧美日一级片| 日本亚洲娇小与黑人tube| 久久re视频精品538在线| 99福利视频导航| 描写细腻的高h肉| 欧美综合国产精品日韩一| 国产麻豆剧果冻传媒影视4934| 午夜影院和视费x看| 先锋资源久久| 99久久国产综合精品1尤物| 久久毛片免费看一区二区三区| 国产一卡2卡3卡四卡国色天香 | 欧美成人香蕉在线观看| 国产欧美曰韩一区二区三区| 动漫a级片| 亚洲高清中文字幕| 欧美伊人影院| 美女禁18| 极品蜜桃臀美女啪啪| porno xxxx日本| 午夜影院免费体验| 欧美日韩一区二区综合在线视频| 女高h| 91在线高清视频| 久久精品嫩草影院免费看| 草草国产成人免费视频| 女人把私密部位张开让男人桶 | 青青青草免费| 日本xxxxxx片免费播放18| 亚洲成片在线看| 欧美洲大黑香蕉在线视频| 催眠白丝舞蹈老师小说| 成人在线观看网站|